Description
Consisting of
- Installation rail
- Draabe water treatment system-pure water for supplying process water and the air humidification system in the pressroom
- Water softener
- 2 Expansion memory
- Water tank 400 liters with operating pressure 10 bar
- Pressure increase
- Piping (disassembled)
- 4 Nebulizer CSV simple
- 4 Nebulizer CSV double
Attention: The container clean water system must be rented separately from Draabe and is then replaced every 6-8 months in a row for maintenance.